On 21st Jun 2024
23rd Jun 2024
$1000
Supply and installation of approximately 66m of 52mm mains conduit (orange) with draw string, trench to be a minimum 700mm deep fitted with electrical danger tape - Supply and installation of approximately 60m of 32mm NBN conduit (white) with draw string to be at a minimum depth of 500mm - Supply and installation of approximately 6m of 20mm copper gas main, fitted with tracing tape& 20mm path valve with gatic cover to be at a minimum depth of 500mm & located 40M past the front boundary on for future connection by Jemena - Supply and installation of approximately 60m of 25mm water supply, fitted with 20mm isolation valve & water meter - Connection to the existing Sydney water main located in street & pay all associated connection and approval fees. All connection Tap in approval for drinking water ready. Gas Mains location diagram provided
No offers yet!